
How Long Does Embroidery Take? The Real Clock From Logo to Box
Decorated embroidery on stock garments runs 7 to 10 business days from proof approval, and a fully custom garment built from the fabric up runs about 45 days door to door. The clock starts at proof approval, not at your first email, so the days before approval are the ones you control.
Embroidered polos, shirts, hats and bags on stock garments take 7 to 10 business days from the day you approve the proof, with shipping on top. Fully custom apparel takes about 45 days door to door. Weekends and holidays do not count.
01The two clocks every company order runs on
There are two clocks, and the product decides which one you are on.
If your logo is going on a polo, quarter zip, hat or bag that already exists, you are on the short clock. That is logo embroidery on stock garments, and it runs 7 to 10 business days from proof approval.
If you want the garment itself built to your spec, with your fabric, cut, colors and fit, plus woven neck labels and branded packaging, you are on the long clock. That is fully custom apparel made direct with our manufacturers, and it runs about 45 days door to door. Know which clock you are on before you announce a hand out date.
02Where the clock starts
The clock starts the day you approve the proof. Not the day you send the first email.
Everything before approval is setup, and setup moves at the speed of your answers. A quote goes out, you confirm garments and colors, we build a proof showing placement, size and thread colors, and you sign off. If you want the full sequence, here is how an order runs from quote to proof to delivery.
Do not rush the proof itself. We wrote up the checks worth making before you sign a proof, and none of them take long. A change after approval usually means a new proof, and a new proof means a new start date.
03The days before approval are yours
Every day before approval is spent on your side of the table, and most of them go to files and sizes.
Quote. Tell us the garment, the count and the date you need the boxes in hand. The date goes first.
Logo file. A vector file is the clean start. Check the logo files we can work from before you dig through old email threads. If all you have is a small JPG from the website, say so early.
Garment and color. Pick the style and the color.
Sizes by person. Collect sizes from the people who will wear them. Our notes on sizing a company polo order without guessing come from the polos in our PILLAR line.
The proof. You get a proof showing placement, size and thread colors. You approve it, and the 7 to 10 business days begin.
Every day spent hunting for a vector file or chasing the last three people for their sizes comes off the front of your calendar, not ours. If the file is the holdup, read up on the logo file an embroiderer actually needs, over at PILLAR.
Deadlines are rarely lost after the proof. They are lost in the inbox before it.
04What happens after you approve
After approval, the 7 to 10 business days are on us, and your job is mostly done.
We prep the file first. Your logo becomes a stitch file, the set of instructions embroidery machines read to lay down each stitch in order and in your thread colors. The garments arrive. Your logo is embroidered, and orders are packed by size and name so the box opens ready to hand out.
Then it ships. Shipping time sits on top of the 7 to 10 business days and depends on where the box is going. We ship nationwide, and we do not promise delivery dates, because the carrier owns that part of the trip. What we can give you is a ready window.
05The calendar for the next six weeks
If the boxes need to be in hand before the holiday break, approve the proof by Mon, Dec. 7 at the latest, earlier if it ships far. Approve it a week later and the ready window runs into the week between Christmas and New Year's.
| Proof approved | Ready window (7 to 10 business days) |
|---|---|
| Mon, Nov. 23, 2026 | Thu, Dec. 3 to Tue, Dec. 8 |
| Mon, Nov. 30, 2026 | Wed, Dec. 9 to Mon, Dec. 14 |
| Mon, Dec. 7, 2026 | Wed, Dec. 16 to Mon, Dec. 21 |
| Mon, Dec. 14, 2026 | Wed, Dec. 23 to Tue, Dec. 29 |
| Mon, Jan. 4, 2027 | Wed, Jan. 13 to Tue, Jan. 19, 2027 |
This is business day math for a ready window, skipping weekends plus Thanksgiving, Christmas, New Year's Day and MLK Day. Shipping time is on top. It is a planning tool, not a promise.
Notice what the holidays do. Christmas and New Year's Day stretch the fourth row across the break. If gifts are the reason for the order, here is when to order embroidered holiday gifts, counted back from the party. Already past the safe line? There are last minute gifts that still work, and most of them start with a simpler order.
06What adds days and what does not
Setup and decisions add days. Quantity mostly does not.
What adds time
A new logo. A logo that is new to us needs setup, a $35 one time charge. The file is kept on record, so a reorder skips that step entirely.
Proof revisions. Each round of changes is another proof to build and another approval to wait on.
Mixed garments. Polos for the sales team, quarter zips for leadership and hats for everyone is a fine order. It is also several proofs.
Names per person. Personalized names mean a name list to collect, check and match to sizes. A misspelled name is far cheaper to catch on the list than on the shirt.
Large jacket backs. A full back design is a much bigger file than a left chest logo, priced at $55 up to 22,500 stitches, and it deserves a careful proof.
What does not change the clock much
Quantity. There are no minimums, so a dozen polos and a few hundred start from the same proof. Quantity mostly changes the price per piece: standard embroidery on shirts runs $10.75 per piece at 1 to 8 and $5.25 at 72 and up, decoration only, with the garment quoted separately.
Rush
Rush is available on some orders, and the timing depends on the order. Ask on the call or on the quote form, and you will get a straight answer on whether it works.
07When 45 days is the right clock
Fully custom is the right call when the garment itself is the brand and you have about 45 days to spend.
Production alone runs 30 to 35 days. The rest of the window covers the first call, the specs and pre production sample approval, which is part of every fully custom build, plus the trip to your door. The exact timeline is confirmed on the first call.
Here is how the math looks. Say a new hire class starts Mon, Feb. 1, 2027 and you want custom polos. Count back about 45 days and the first call needs to happen by about Fri, Dec. 18, 2026. We wrote more about apparel timed to a new hire's start date over at PILLAR.
If you are already inside 45 days, go back to the short clock. A good stock polo with a clean left chest logo beats a custom polo that shows up after the people it was made for.
08FAQ
How long does embroidery take for a company order?
Embroidery on stock garments runs 7 to 10 business days from proof approval, with shipping time on top. Fully custom apparel built from the fabric up runs about 45 days door to door, and that timeline is confirmed on the first call.
How long do embroidered shirts take?
Embroidered shirts and polos on stock garments run on the same clock: 7 to 10 business days from the day you approve the proof. Shipping is added on top and depends on where the box is going.
When does the turnaround time actually start?
At proof approval. The quote, the logo file, the garment choice and the sizes all happen before the clock starts, so the faster those come together, the sooner your 7 to 10 business days begin.
Can you rush an embroidery order?
Rush is available on some orders, and the timing depends on the order. Ask on the call or on the quote form with your date, and you will get a straight answer on whether it works.
Do bigger orders take longer?
Quantity mostly changes the price per piece. There are no minimums. What adds time is a new logo that needs setup, extra proof revisions, mixed garments, names per person and large jacket backs.
Do weekends and holidays count as business days?
No. Business days skip weekends and holidays, so a proof approved the week of Thanksgiving or Christmas lands later than the same approval in an ordinary week.
Start the clock
Approve a proof, start the clock.
Send your date, logo, count and garment, and we will build the proof and tell you the ready window.

